Asphalt Road Pavement Rehabilitation and Maintenance Practices / Najlacnejšie knihy
Asphalt Road Pavement Rehabilitation and Maintenance Practices

Kód: 38571673

Asphalt Road Pavement Rehabilitation and Maintenance Practices

Autor Leevesh Kumar

This study mainly aimed at assessing asphalt road pavement rehabilitation and maintenance practices in West Showa Zone with particular reference to the roads from Ambo to Gedo which covers over 64kms. The study aimed at identifyin ... celý popis

57.35

Bežne: 63.52 €

Ušetríte 6.17 €


Skladom u dodávateľa
Odosielame za 9 - 11 dní
Pridať medzi želanie

Mohlo by sa vám tiež páčiť

Darčekový poukaz: Radosť zaručená
  1. Darujte poukaz v ľubovoľnej hodnote, a my sa postaráme o zvyšok.
  2. Poukaz sa vzťahuje na všetky produkty v našej ponuke.
  3. Elektronický poukaz si vytlačíte z e-mailu a môžete ho ihneď darovať.
  4. Platnosť poukazu je 12 mesiacov od dátumu vystavenia.

Objednať darčekový poukazViac informácií

Viac informácií o knihe Asphalt Road Pavement Rehabilitation and Maintenance Practices

Nákupom získate 145 bodov

Anotácia knihy

This study mainly aimed at assessing asphalt road pavement rehabilitation and maintenance practices in West Showa Zone with particular reference to the roads from Ambo to Gedo which covers over 64kms. The study aimed at identifying pavement distresses and causes of pavement distresses. According to data collection and analysis, it was found that the material properties and composition (28.1%), construction quality (18.8%), and road maintenance standards (15.6%) were perceived to be the major causes of pavement distresses on the roadway under study. On the other hand, the result of survey condition data obtained from ERA was analyzed and major distresses were identified including longitudinal joint crack, bleeding and tripping, potholes, generalized marked fretting, deformation, subsidence, rutting, patch, wide block crack, isolated scabbing, low shoulder and wheel path rutting. Besides, limited skilled manpower (x =3.78), lack of appropriate pavement management system (x =3.93), budget constraint (x =4.43), absence of appropriate machinery (x =3.53), and lack of monitory and quality control (x =3.75) were among the major challenges related to effective pavement work.

Parametre knihy

Zaradenie knihy Knihy po nemecky Sozialwissenschaften, Recht, Wirtschaft Politikwissenschaft Politikwissenschaft - Sonstiges

57.35

Obľúbené z iného súdka



Osobný odber Bratislava a 2642 dalších

Copyright ©2008-24 najlacnejsie-knihy.sk Všetky práva vyhradenéSúkromieCookies


Môj účet: Prihlásiť sa
Všetky knihy sveta na jednom mieste. Navyše za skvelé ceny.

Nákupný košík ( prázdny )

Vyzdvihnutie v Zásielkovni
zadarmo nad 59,99 €.

Nachádzate sa: